Shanghai Electric Power Generation Equipment Co Ltd Turbine Plant-_欧洲杯在线买球_欧洲杯让球平台-【官网直营】@
Nuclear Steam Turbine For The Second Plus Generation Reactor
SEC's nuclear power turbine for the second plus generation reactor covers the power range from 1000MW to 1200MW. Turbines mainly matches CPR1000 reactor, and is suitable for various back pressures.
    • Excellent performance, safety and reliability, convenient maintenance

    • 8 units for CPR1000 reactor are ordered and put into operation.

    • Typical projects: Guangdong Yangjiang nuclear power project, Guangxi Fangchenggang phase I nuclear power project.


 8  nuclear power turbines for the second plus generation reactor of SEC have already put into operation. The measured power of the units is higher than the designed value, which highly appreciate by the customers. The performance has reached the world-class level.

Unit type: three cylindera and four exhaust, condensing type and with MSRs, shrunk rotor, rated speed 1500rpm, 1396mm last stage blade.

Advantages:

  • High Performance

  • Advanced and Efficient AIBT blade flow Design Technology.

  • Flow optimization design of CFD structure.

  • Flexible Operation

  • Button start-up; Built-in stress/temperature control, easy operation.

  • Rise rate/load change rate program automatically calculates, 5 minutes from zero speed to rated speed.

  • Easy Maintenance

  • High reliability of the series, Major maintenance interval: 12 years;

  • HP module integral transport after assembled in the factory; Install as modular.

  • Integral high-pressure cylinder design, greatly shorten the maintenance cycle.

  • Combined fuel tank, Highly integrated auxiliary system.


Contact Us
Shanghai Electric Power Generation Equipment Co Ltd Turbine Plant