Fuqing Nuclear Power Plant _1000MW deaerator
The first 1000MW deaerator of Fuqing Nuclear Power Plant manufactured in Lingang workshop, which is the heaviest deaerator of nuclear power plant so far. This deaerator was put into operation in December 2014.

    Haiyang 1#2# 1000MW deaerator;Fangjiashan 1#2# 1000MW deaerator;Hongyanhe 1#~6# 1000MW deaerator

As the country's largest professional design and manufacture of deaerator manufacturer, our company has successfully manufactured the deaerators for the first million-g level thermal power unit, and the first million- level nuclear power unit in China. The products have used in Electric Power, Petrochemical and Environmental Protection fields etc. The company is in the leading position in thermal & nuclear power power. At the same time, the company is also the organization unit of the national deaerator standard JB/T10325-2002, and has undertaken the national-level project development of the national 1000MW nuclear power CAP1400 and CAP1700.

The company has the strong design and development technology of various contact and surface type deaerator, independent research and development capabilities and laboratory test conditions, and designs a number of special devices for deaerator, and obtains a number of deaerator patents.The overall supply is convenient for site installation to avoid the welding work of the deaerator and water tank.

Low exhausted steam loss and low steam consumption improve the thermal efficiency of the unit.The heating steam is sended into the underwater, so that the overall working temperature level of the deaerator is lowered, and the thermal fatigue life of the metal is greatly improved.The oxygen removal effect is better and the oxygen content of feed water is less than 5ppb.